|
HOC
shall comply with the laws and regulations
in each country in which we operate. |
 |
No real
property will be either acquired, transferred
or divested without review, risk management
assessment (Health, Safety and Environmental),
and approval of both Corporate Legal and
HSE Departments. |
 |
All sites shall maintain a
Site Environmental History File. |
 |
All sites shall have written
Waste Management and Waste Minimization Plans,
and furthermore, shall adhere to the Company’s
Waste Minimization Policy. |
 |
Industrial
air and water discharges shall be permitted
and monitored as required by local (Dubai
Municipality) regulations, or Company “standards
of care” if no regulations exist. |
|
All sites
where hazardous substances are used or stored
shall have a written Spill Prevention Control
and Countermeasure Plan. |
 |
All storage
tanks shall be designed and installed using
good engineering practices and inspected
regularly. |
 |
All storage tanks shall be
installed in a contained area. |
 |
Storage
areas for liquid hazardous substances shall
be equipped with secondary containment. |
 |
All facilities
will be inspected by an HOC Health and Safety
Committee member or their designee several
times every week. |
|
|